Provide the Following Information for Service to Your New Business
- $50 membership deposit plus $30 service charge, plus applicable taxes
- Consumer Deposit: The deposit for a new commercial account will be determined by a load study conducted by the cooperative. In lieu of a deposit for a commercial account, members/applicants may acquire and provide to the cooperative a letter of credit from a reputable financial institution equal to the amount of the required deposit. The cooperative reserves the right to refuse a letter of credit from a financial institution that the cooperative determines not to be reputable.
- Application for commercial or business accounts (PDF)
- Social security number or tax identification number
- United States government-issued photo identification
- Nearest neighbor’s name and address
- What kind of service? 100 or 200 amp service
- Heated square feet
- Right-of-Way easement signed by landowner(s)
The easement must be printed on legal-sized paper and notarized - Refer to the Line Extension Policy (PDF) for information on construction charges.
- Dixie Electric does not supply temporary meter poles
- Accounts in Forrest, Jones, or Covington counties need a Flood Plain Permit from their respective county
- Before applying for service, contact the E-911 coordinator in your county to establish your 911 address
- Depending on the size of the service, a contract may be required
- Mark water and sewer lines if down. Call Mississippi 811 for the location of utilities
Mississippi One Call Law: All persons preparing to dig must call Mississippi 811 or utilize the online E-locate system two days prior to the beginning of any work. Underground facilities will be marked using the color code system, and then work may proceed.
Quality Service
Dixie Electric Power Association is an electric cooperative and is governed by the following documents and statements that assure fair, equal, and quality service to the Association’s members:
- Dixie Electric’s Bylaws (PDF)
- Service Rules and Regulations (PDF)
- Line Extension Policy (PDF)
- Statement of Nondiscrimination (PDF)
Membership Applications
- Please return your application via mail or fax. Here is the contact information for Dixie Electric’s district offices.
- Application for Residential Accounts (PDF)
- Application for Business and Commercial Accounts (PDF)
- Landlord Service Continuance Request (PDF)
- Temporary Electrical Service Agreement – English (PDF)
- Temporary Electrical Service Agreement – Spanish (PDF)
Diagrams for New Service – Wiring and Meter Point Locations
- Commercial Overhead Service to Meter Pole (PDF)
- Overhead Service to Residential (Above Roof) (PDF)
- Overhead Service to Residential (Below Roof) (PDF)
- Residential Overhead Service to Meter Pole (PDF)
- Residential Underground Service to Meter Pole (PDF)
- Underground Service to a Residence (PDF)
Right-of-Way Easements
In an effort to conform to the document formatting standards required by Mississippi state law, Dixie Electric’s management is requiring that all easements be printed on legal paper. No other size paper will be accepted.
- Easement Form – Standard (PDF)
- Easement Form – Standard with a Witness (PDF) (Statement for the notary)
- Easement Form – Corporation_LLC (PDF)
- Easement Form – Representative (PDF) (Representatives for a church, state, power of attorney, etc.)
Please print/duplicate easements on legal-size paper. Easements that do not meet formatting standards will be returned.
Service Documents
- Authorization for Recurring Check Payments (Bank Draft) (PDF)
- Authorization of Recurring Credit-Debit Card Payments (PDF)
- Bankdraft Stop Form (PDF)
- Outdoor Light Agreement (PDF)
- Medical Alert List Form (PDF)
- Member Load Information Sheet (PDF
Distributed Generation (Solar, Wind, Thermal, etc.)
- Distributed Generation Process Document (Application) (PDF) – This document outlines the steps to go through for distributed generation and provides the application that needs to be submitted before the installation begins.
- Interconnection Agreement (PDF) – This agreement will be executed after the installation has been inspected.
- For general information about alternative forms of energy, check out the Energy Information & Tips page